DECEMBER 2nd

SHOP is open in new build. COME & SHOP!!

THE BUILD - Autumn 2019

        Week 1-Sept. 2nd

December 1st

SHOP MOVED BACK

NOW OPEN in new build - COME & SHOP!!

Stock to move back
Stock to move back

Moving shop back 1
Moving shop back 1

2nd December 4
2nd December 4

Stock to move back
Stock to move back

1/14

       The way it was

                 

                   August 29th

The store room                  Storeroom doorway

Store room (3).jpg
Store room (4).jpg
Ready to begin
Ready to begin

Disconnecting electricity
Disconnecting electricity

Builders yard!
Builders yard!

Ready to begin
Ready to begin

1/16

 Weeks 5 and 6 

      Week 2 - Sept. 9th

Excavated footing 1
Excavated footing 1

Both footings
Both footings

Glistening cement
Glistening cement

Excavated footing 1
Excavated footing 1

1/9

          Weeks 3 and 4 

All set to strip the roof
All set to strip the roof

Sections of structural roof beam
Sections of structural roof beam

Insulation above rafters.
Insulation above rafters.

All set to strip the roof
All set to strip the roof

1/19

       Weeks 7 and 8

Structural engineering under the flat
Structural engineering under the flat

Cafe exit
Cafe exit

End of week 8 'Office' interior
End of week 8 'Office' interior

Structural engineering under the flat
Structural engineering under the flat

1/27
Interior of roadside verge ready for ins
Interior of roadside verge ready for ins

Insulation to side by roadside verge
Insulation to side by roadside verge

Office
Office

Interior of roadside verge ready for ins
Interior of roadside verge ready for ins

1/18

Weeks 9 and 10

Plaster boarding 1
Plaster boarding 1

Plasterboarding 2
Plasterboarding 2

End week 10-Cafe exit. Wc on left.
End week 10-Cafe exit. Wc on left.

Plaster boarding 1
Plaster boarding 1

1/27

       October

Shop moves to village hall 

Packing up the shop
Packing up the shop

Packing up the shop (2)
Packing up the shop (2)

Weekend success
Weekend success

Packing up the shop
Packing up the shop

1/18

 Weeks 11-13 

Cladding is added
Cladding is added

Cladding 2
Cladding 2

Up on the roof
Up on the roof

Cladding is added
Cladding is added

1/29